Extension of the existing system with two additional lines – lines 5 and 6 and an additional robot. The principle of operation was kept the same as in the previous system. We also designed the electrical cabinets for the implementation, which we put into operation in the customer’s hall. In the project we used Siemens 1500 series controllers, ABB robot and Siemens HMI Panel.